Video
On-load tap changer (OLTC) explained
- Duration
- 35 seconds
- Language
- Spoken in English
- Captions
- English captions, switchable from the player
- Published
- Published November 12, 2026
What is behind this video
A steel-mill transformer changes taps at full load without a single blink. It does not break, then make: it makes before it breaks. The selector preselects the next tap with no current, then the diverter moves the load in 40 to 60 milliseconds through bridging resistors. Every change wears the contacts; maintenance goes by operation count, not just the calendar.
It does not break, then make: it makes before it breaks. The selector preselects the next tap with no current, and the diverter transfers the load in forty to sixty milliseconds through bridging resistors. The circuit is never left open, even for an instant, while the transformer stays in service.
Forty to sixty milliseconds. In that interval the bridging resistors carry the transfer so the current is not cut. It is a short time, but each operation is a mechanical and electrical event on the contacts, not a simple position change on an ordinary switch.
Not by the calendar alone. In a service with many tap changes, such as a steel mill, the changer operates all day and every operation wears the contacts. The video says maintenance should also follow the operation count, so accumulated wear is not left out of the program.
The references behind what the video says are: Typical diverter transfer time of 40 to 60 ms (on-load tap-changer basics, e.g. Reinhausen).
This piece is animation and typography: it does not show TEVKO personnel. The figures are the ones in the script and can be checked against this page and the linked pages.
Transcript — English audio
How does a steel mill transformer change taps under full load without a single blink? It doesn't break, then make.
It makes before it breaks. The selector preselects the next tap with no current, then the diverter moves the load in 40 to 60 ms through bridging resistors.
Like a trapeze artist who won't let go of one bar until gripping the next. But watch out: in a steel mill it operates all day, and every change wears the contacts.
Maintenance goes by operation count, not just the calendar. So it's not a switch.
It's a relay race. Comment OLTC and we'll tell you when yours is due.
The same captions ship as a WebVTT track inside the player. The spoken close invites a comment on the network where the video was posted. On this page the contact is ventas@tevko.com and the phone +52 33 2101 7241.
Questions this video answers
How does an OLTC change taps without interrupting the load?
It does not break, then make: it makes before it breaks. The selector preselects the next tap with no current, and the diverter transfers the load in forty to sixty milliseconds through bridging resistors. The circuit is never left open, even for an instant, while the transformer stays in service.
How long does the diverter take to move the load?
Forty to sixty milliseconds. In that interval the bridging resistors carry the transfer so the current is not cut. It is a short time, but each operation is a mechanical and electrical event on the contacts, not a simple position change on an ordinary switch.
Should OLTC maintenance be scheduled only by the calendar?
Not by the calendar alone. In a service with many tap changes, such as a steel mill, the changer operates all day and every operation wears the contacts. The video says maintenance should also follow the operation count, so accumulated wear is not left out of the program.
Related pages
Technical content reviewed by TEVKO Technical Management · last reviewed: November 12, 2026
Request a technical assessment
Write to our sales inbox with the following and we will tell you what the next step is:
- The nameplate: rating, voltage, make and serial number.
- The location of the installation.
- The problem the unit presents, or the event that occurred.