TEVKO
Worker opening an inspection cover on the top of a transformer tank

Service

Transformer and substation contingency response

Remote technical assessment subject to availability and scheduled on-site crew for critical assets with unplanned outages, across Mexico.

Worker opening an inspection cover on the top of a transformer tank
What the photo showsWorker opening an inspection cover on the top of a transformer tank.

An unplanned outage of a power transformer or substation can stop an entire operation. The cost of every hour without power far exceeds the cost of a fast, well-executed response.

Share the nameplate data and the condition you observe; we reply with the proposed scope.

Our contingency service starts with a remote technical assessment to scope the problem, followed by scheduled crew and equipment mobilization to site, including heavy maneuvering when needed.

Because the lead time for a new transformer is months, the fast rehabilitation of the existing asset is often the only viable option to restore continuity — and that is exactly what we do under emergency conditions.

What we cover

Critical asset outage

Remote technical assessment, on-site diagnosis and intervention for transformers/substations down.

When it applies: Unplanned outage of a critical asset.

Fast rehabilitation

On-site or in-plant fast repair to restore continuity.

When it applies: When replacement lead time is unacceptable.

How we respond

Remote technical assessment

Scoping of the problem, subject to availability.

Mobilization

Scheduled crew and equipment mobilization to site.

Intervention

Fast, safe repair to restore continuity.

Follow-up

Diagnosis and recommendations to prevent recurrence.

Frequently asked questions — transformer and substation contingency response

What does the contingency service cover?

Remote technical assessment and on-site crew for critical transformers and substations with unplanned outages, with heavy maneuvering capacity across Mexico.

How fast do you respond?

The remote technical assessment is scheduled subject to the availability of our technical team once the event data is shared. Crew mobilization to site is then scheduled according to location, scope and the resources required.

Can you fix it instead of replacing?

In most emergencies, the fast rehabilitation of the existing asset is the only viable path, since a new transformer takes months to deliver.

Do you cover the whole country?

Yes, with coverage across Mexico and the backing of Grupo TEMISA's plant and capabilities.

Transformer and substation contingency response in images

Worker on a transformer beside the bushings, with a crane boom in the background
Worker on a transformer beside the bushings, with a crane boom in the background
Worker applying a wrench to the terminal of a bushing
Worker applying a wrench to the terminal of a bushing
Worker on a ladder servicing electrical equipment on a pole.
Worker on a ladder servicing electrical equipment on a pole.

Related services

Talk to a transformer specialist

Tell us about your asset so we can define the assessment scope and prepare a tailored quote.

Get a quoteEmergency